A PLANVYA NEWSPAPERSUNDAY, NOVEMBER 8, 2026NATIONAL / SUNDAY EDITION
THE BIG STORY / INFRASTRUCTURE
The next wave of work.
$1.24 billion for rail crossings. A $37 billion transmission program. The announcements are big. The opportunity is in the details.
RAIL INFRASTRUCTURE / Chicago’s Forest Hills Flyover under construction, October 6, 2024. Illustrative file photograph of related rail work; not a project identified in the new grant announcement. Photo: Pi.1415926535 / Wikimedia Commons · CC BY-SA 4.0
A new federal rail funding announcement reaches 37 states. Meanwhile, utilities are organizing the teams behind a major transmission buildout. For contractors, the useful question comes next: which work is funded, who is buying, and when can you actually bid?
YOUR NEXT OPPORTUNITY COULD BE INSIDE.National reporting · Project leads · Field perspective
A SMALL PRICE. A BETTER-INFORMED WEEK.
Read the industry. See your next move.
What changed. National and international reporting with sources you can inspect.
Where work is moving. Project owners, funding signals and procurement paths.
What it means on site. Technology, people, safety and a worthwhile break-room read.
New subscribers get 7 days free, then $0.75 plus applicable tax every week until canceled. Card required. Cancel before the trial ends to avoid a charge. One trial per account. Cancel renewal online. No print delivery.
NEW / THE CONSTRUCTION EXCHANGE
Good people. Useful tools. Real opportunities.
Free basic community listings at launch. Hiring, available crews, tools, equipment and trade services. Reviewed before publication.
THE FIELD EDITION / ADVERTISING
Be seen beside the work that matters.
Choose your place in the paper. Every paid placement is labeled; editorial decisions stay independent.
YOUR AD
01 / Text placement
Featured classified
A paid one-issue newspaper placement for services, equipment or hiring. Free basic community listings are available in The Exchange.
$25 / one issue
YOUR AD
02 / Display placement
Section spotlight
Put your message alongside the construction subjects your customers follow.
$75 / one issue
YOUR AD
03 / Premium placement
Front-page sponsor
A prominent, clearly labeled position beside the week’s cover report.
$150 / one issue
Launch inventory. No audience size or results are guaranteed. One digital issue, plus applicable tax. Artwork and issue date require review. Full refund if declined or not placed within 30 days. No automatic renewal.
BRAND PARTNERSHIPS / SPACES AVAILABLE
A place for brands that build.
OPEN PLACEMENT
Project Spotlight
Equipment, materials and construction technology beside visual project reporting.
OPEN PLACEMENT
Safety Desk
PPE, training and safety technology. Advertising stays separate from reporting.
OPEN PLACEMENT
Daily Break
A recurring spot beside the crossword and field challenge.
OPEN PLACEMENT
The Exchange
Reach readers browsing crews, tools and equipment.
FULL-PAGE BRAND SHOWCASE / BY ARRANGEMENT
Room to tell your product story.
Discuss a full-page placement or a multi-issue campaign with the desk. Availability and price are confirmed before purchase.
These are available advertising positions, not current sponsors. No brand affiliation, readership total or response rate is implied. Section preferences are confirmed after review; checkout does not reserve exclusive category rights.